section 13
The fitting shall conform to the quality standards as prescribed.
The Sikkim Water Supply and Water Charges Act, 2025Infrastructure202543 sections
Statutory text
Validity of permission
- (1) The sanction permitting supply of water under this Act shall be valid for a period of 6
- (six) months from the date of its issuance. Failure by the applicant to install requisite piping and obtain physical connection within this period or within such extended time as may be granted by the competent authority, shall render the sanction as inoperative.
- (2) If the applicant whose sanction is rendered inoperative needs the water supply connection, he shall apply for fresh connection on payment of prescribed fees again.
Study data processing for this section.
PDF: pending for this language.