section 7A
Temporary water connection
The Delhi Water & Sewer (Tariff & Metering) Regulations, 2012a) A temporary water connection may be applied for in the format prescribed for regular connection initially for a period not exceeding three months, subject to technical feasibility, provided that applicant pays prescribed security deposit for the period for which such connection is applied. Such connection is renewable maximum for another period of three months. b) Applicant will apply for such connection by submitting his application alongwith authorization letter and identity proof and security amount for the entire period for which water connection has been applied. Amount will be assessed on the basis of estimated consumption assessed by area Executive Engineer or Joint Director (Revenue) concerned. c) Such connection may be allowed in vacant plot or temporary shed, for holding a fair, function, circus, or such events where large number of people are expected to attend. d) Subject to availability of sufficient quantity of water, such water connection for construction purposes (new or additional), may be allowed by ZRO after consulting area Zonal Engineer. In such case, charges as mentioned in Annexure I of Schedule III hereto will be applicable, which were calculated by area ZE. However, such connection cannot be claimed as a matter of right. e) All other provisions as applicable to the regular consumer will be applicable to such connection also. f) It will be the duty of the consumer to get his temporary connection disconnected through a licensed plumber or authorised agency of the Board after expiry of the sanction period and clearing all the arrears, failing which consumer will be liable to pay the penalty in addition to the arrears.
Study data processing for this section.
PDF: pending for this language.