section 3
Water Connection
The Delhi Water & Sewer (Tariff & Metering) Regulations, 2012(a) A regular connection shall be considered, on receipt of an application in the prescribed format as provided in Annexure-I of Schedule-I hereto alongwith requisite documents and fees as prescribed in Annexure-II of Schedule-I. (b) Application may be made by the owner/occupier of a property once the construction is completed in that property or by the owner/occupier of such premises where Board has provided/ extended water distribution system in that area after the construction provided that such construction is authorized one. (c) No person is authorised or allowed to draw water from Board’s water system by any means other than through sanctioned water connection. (d) No regular connection will be allowed in a vacant plot/piece of land. (e) No individual connection will be sanctioned to any flat or house in a co-operative group housing society/ apartment complex or other domestic/non-domestic complexes where bulk connection either exists or is required to be given under the policy in force of the Board. (f) No water connection will be sanctioned for the basement of any building. (g) Individual water connection will be sanctioned for a single dwelling unit / floor subject to maximum of six in a property. (h) Assessment of technical feasibility and sanction of Bulk water connection will be the jurisdiction of Executive Engineer concerned. ZRO will forward the file accordingly after completing the formalities. (i) Water supply shall not be provided unless arrangement for proper disposal of waste water exists.
Study data processing for this section.
PDF: pending for this language.