section 4
Sewer Connection
The Delhi Water & Sewer (Tariff & Metering) Regulations, 2012(a) Wherever sewage system is in existence and maintained by the Board, it shall be mandatory for a consumer to obtain a sewer connection by submitting application in the format prescribed in schedule-I after paying requisite fee and charges, failing which, besides disconnection of water supply bill will be raised to such consumer in respect of Sewer charges and/or Development Charges. (b) Application may be made by the owner/occupier of a property once the construction is completed in that property or by the owner/occupier of premises where Board has laid sewerage facilities in a particular locality after the construction; provided such construction is authorized. (c) No person is authorized or allowed to put sewage in Board sewerage system other than through sanctioned sewerage connection. (d) No regular sewer connection will be allowed in a vacant plot/piece of land. (e) No individual connection will be granted to any flat or house in a co-operative group housing society/apartment complex or other domestic/non-domestic complexes where bulk connection either exists or is required to be given under the policy in force of the Board. (f) No Sewer connection will be sanctioned in the basement of any building.
Study data processing for this section.
PDF: pending for this language.