section 6
Procedure for sanction of Water and Sewer Connection
The Delhi Water & Sewer (Tariff & Metering) Regulations, 2012(a) Any person who is resident of territorial jurisdiction of Board and where services are maintained by the Board, is eligible to apply for new connection under regulation 3 and 4, subject to following conditions: i) Technical feasibility for providing services should exist. ii) Applicant is required to attach the identity proof and ownership/ occupancy proof and no objection certificate from owner in case of tenant with the application. iii) There should not be any outstanding dues towards the Board against the property on account of water/ sewer/ development/ infrastructure charges etc. iv) In case there are more than one occupier/ owner then the outstanding arrears/ dues in respect of the share amount will be paid by the applicant. ZRO will assess and prepare a site report before levy such share amount. v) Applicant is bound to abide by the conditions mentioned in the application form and is required to pay the fees, security deposit or any other charges as applicable or as may be levied by the Board from time to time. The sanction of connection in any premises does not acknowledge or confer any title, ownership or occupancy right in favour of the applicant. (b) Water shall be supplied, subject to technical feasibility, through sanctioned appropriate sized ferrule in consonance to the estimated water consumption of the consumer. (c) Subject to the fulfilment of above mentioned requirements and approval of ZRO/ competent authority, a new connection may be sanctioned. Applicant is required to make payment of the demand raised by the ZRO office, which shall be deposited within a period of fifteen days failing which a fresh bill will be issued. (d) The consumer will be given a boring date and time by ZRO under intimation to JE concerned when the consumer is required to get connection installed on the Board distribution line through a licensed plumber or any agency having licenced plumbers of the Board. Execution of the work by other than a licensed plumber shall lead to levy of penalty provided in Schedule IV of the Act. (e) Wherever it is found that the installation of connection has been done in contravention of the sanction, such as fixation of ferrule of a size other than the sanctioned one, or through unauthorized person or the work is executed on any other date than the prescribed one, such boring will be treated as unauthorized and the sanction is liable to be withdrawn, in addition to imposition of penalty as provided in Schedule IV of the Act. Provided that in case consumer gives sufficient reason for not executing the work on the specified date he may approach ZRO within 15 days, giving reasons for the failure and request for grant of another boring date, in which case, ZRO upon being satisfied, may give new date for boring. (f) In case of detection of unauthorized connection at the property, where connection has been applied for, consumer is required to get such unauthorized connection regularized first in applicable category by paying penalty, water charges for three years and water connection charges, failing which such connection may be cut off, besides issuance of challan and withholding of sanction for new connection. (g) It would be open for the Board to provide a certificate in respect of the availability/ adequacy of water and sewer system in a property for purpose of sanction of building plan by the Municipal Corporations of Delhi/ DDA or any other competent authority.
Study data processing for this section.
PDF: pending for this language.