section 39
Compulsory evaluation in certain cases.
The Dam Safety Act, 2021Infrastructure202156 sections11 chapters
Chapter IX COMPREHENSIVE DAM SAFETY EVALUTION
Statutory text
The comprehensive dam safety evaluation referred to in section 38 shall be compulsory in the case of, —
- (a) major modification to the original structure or design criteria;
- (b) discovery of an unusual condition at the dam or reservoir rim; and
- (c) an extreme hydrological or seismic event
Study data processing for this section.
PDF: pending for this language.