section 46
Appointment and Role of Independent Engineer
The Tamil Nadu Transparency in Tenders Act, 1998(1) While preparing the draft Concession Agreement for any project, the Procuring Entity shall specifically consider the need to appoint an Independent Engineer for the project and if considered necessary, include necessary provisions in the Agreement. (2) The Independent Engineer’s scope of work shall be specified in the Concession Agreement and shall inter-alia include: (a) Review, inspection and monitoring of construction works, examination of the designs / drawings and conduct of tests; (b) Issue of progress reports and completion certificates during and after completion of the construction period; (c) Review and inspection of the operations and maintenance arrangements and monitoring compliance with the performance and maintenance standards, during the operations period; (d) Identifying delays and lapses that require action on part of the Procuring Entity for enforcing the agreement terms; (e) Determining the reasonableness of costs for any works or services, as required under the Concession Agreement; (f) Determining the period or extension thereof, for performing any duty or obligations, as required under the Concession Agreement; (g) Carrying out such responsibilities as are assigned by the Procuring Entity. (3) The Independent Engineer shall prepare and submit to the Procuring Entity a monthly progress report. (4) An indicative scope of work for the Independent Engineer is provided for guidance in Schedule-III of this rule. (5) The Independent Engineer shall, at the close of the Concession Agreement, take stock of the asset to be reverted to the Procuring Entity and submit a report on the same in comparison to the asset handed over for operation at commercial operations date and the value addition made thereon.
Study data processing for this section.
PDF: pending for this language.