section 7
If the order is not cancelled by the Collector to require landholder by notice to execute the measures
The Railway Protection Act, 1886Infrastructure188620 sections
Statutory text
If the order is not cancelled by the Collector, he shall by a written notice call upon the landholder so named as aforesaid to carry out, within a reasonable time to be named in the notice, the measures specified in the order as originally issued or modified, as the case may be.
Study data processing for this section.
PDF: pending for this language.