section 11
For the power consumed by power generating Plants, other than State owned for their auxiliaries consumption. | | 15 Percent
The Madhya Pradesh Electricity Duty Act, 1949Provided that if electrical energy sold or supplied for consumption for any one purpose is used either wholly or partially, without the consent of Distributor of electrical energy or producer of electricity, as the case may be, for consumption or any other purpose for which a Higher rate of duty is chargeable, the entire energy sold or supplied shall be charged at the highest rate applicable:
Provided further no electricity duty shall be charged for pump for agricultural irrigation, water and sewage pumping installations of Municipal Corporations and other local bodies used for public utility water schemes and State owned power generating plants.”;
- (ii) in explanation, clause
- (e) shall be deleted.
Study data processing for this section.
Some statutory text is still being prepared for this language version.
PDF: pending for this language.