section I
See sections 2(ac), 2(ae), 3(6), 6A(k), 6A(o), 6F(4)(a), 6F(6), 6F(10)]
The Kerala Infrastructure Investment Fund Act, 1999MATTER FOR WHICH PROVISIONS MAY BE MADE IN THE SCHEME 1. Eligibility of undertaking for assistance 2. The purposes for which the assistance may be given 3. Modes of assistance 4. Interest and penal charges 5. Security for the assistance 6.Appraisal and sanction procedure 7. Disbursement procedure 8. Guidelines for memorandum of understanding /performance contract 9. Recovery procedure 10. Monitoring system 11. Investment of surplus funds 12. Board meetings, 2[xxxx] fees and allowances to members of the Board 13. The method of keeping accounts shall be kept, the preparation of the budget, the audit of accounts and the submission of reports to the Government. 14. The procedure for defraying the expenditure incurred in the administration of the fund 3[15.xxxx] 4[15. Other information with respect to which a detailed study of the project may be conducted after the decision for preliminary investment. 16. Other information with respect to which feasibility study may be conducted. 17. Other powers and functions of the Board. 18. Manner of investing surplus fund of the Board. 19. Value for Money Test. 1 Inserted by Act 15 of 2016 (w.e.f. 19.08.2016). 2 Omitted by Act 15 of 2016 (w.e.f. 19.08.2016). 3 Omitted by Act 15 of 2016 (w.e.f. 19.08.2016). 4 Inserted by Act 15 of 2016 (w.e.f. 19.08.2016). 20. The form and manner of publishing the details of proposed projects by the sponsoring agency, the period in which the report shall be prepared and submitted to the Board by the sposoring agency in respect of the project. 21. Websites in which details of the project to be published.] 1[22.] Any other matter which is to be provided for in the Scheme or which may be necessary or proper for the purpose of implementing the scheme. 2[SECOND SHEDULE [See section 2 (eb)] SECTORS 1. Agriculture Infrastructure. 2. Buildings. 3. Development of Minor Minerals. 4. Drinking and Industrial Water supply systems, Desalination Plants. 5. Education related Infrastructure. 6. Fisheries. 7. Gas and Gas Works. 8. Health Infrastructure. 9. Housing including Slum Development and Development of Satellite towns. 10. Industrical Estates including Industrial Parks and Special Economic Zones. 11. Information and Communication Technology related Projects. 12. Inland Navigation and Inland Waterways. 13. Irrigation including Dams, Irrigation Structures, Canals. 14. Land Reclamation Projects. 15. Ports and Harbours. 16. Power Generation, Transmission and Distribution. 17. Roads, Bridges, including Rail over and under Bridges and By-passes. 18.Solid Waste Management. 1 Renumbered by Act 15 of 2016 (w.e.f. 19.08.2016). 2 Inserted by Act 15 of 2016 (w.e.f. 19.08.2016). 19.Sports and Recreation Infrastructure. 20.Tourism and Hospitality Projects. 21.Transport projects including road, rail and air transport. 22.Urban Transortation System, Bus terminals, Multi level parking facilities. 23.Waste Water, Sewerage treatment systems.
Study data processing for this section.
PDF: pending for this language.