The Indian Boilers Act, 1923
The Indian Boilers Act, 1923
0. Preamble
Act Business Rules / Indian Boilers Act 1923
THE INDIAN BOILERS ACT, 1923 (5 of 1923) (AS MODIFIED UP TO THE 1 ST JULY, 1962)
1. Short title extent and commencement
(1) This Act maybe called the Indian Boilers Act, 1923. (2) It extends to the whole of India except the State of Jammu and Kashmir. (3) It shall come into force on such date as the Central Government may, by notification in the Official Gazette, appoint.
2. Definitions
In this Act, unless there is anything repugnant in the subject or context (a) “accident” means an explosion of a boiler of steam-pipe or any damage to a boiler or steam pipe which is calculated to weaken the strength thereof so as to Render it liable to explode; (aa) “Board” means the Central Boilers Board constituted under section 27A; (b) “boiler” means any closed vessel exceeding 22.75 litres in capacity which is used expressly for generating steam under pressure and includes any mounting or other fitting attached to such vessel which is wholly or partly under pressure when steam is shut off; (c) “Chief Inspector”, “Deputy Chief Inspector”, and “Inspector” mean, respectively, a person appointed to be a Chief Inspector, a Deputy Chief Inspector and and Inspector under this Act; (cc) “economiser” means any part of a feed-pipe that is wholly or partially exposed to the action of flue gases for the purpose or recovery of waste heat; (ccc) “feed-pipe” means any pipe or connected fittings wholly or partly under pressure through which feed water passes directly to a boiler and which does not form a integral part thereof; (d) “owner“ includes any person using a boiler as agent of the owner thereof and any person using a boiler which he has hired or obtained on loan from the owner thereof; (e) “prescribed” means prescribed by regulations or rules made under this Act; (f) “steam-pipe” means any pipe through which steam passes from a boiler to a prime mover or other user or both, if – (i) the pressure at which steam passes through such pipe exceeds 3.5 kilograms per square centimetre above atmospheric pressure; or (ii) such pipe exceeds 254 millimeters in internal diameter; and includes in either case any connected fitting of a steam-pipe; (g) “Structural alteration addition or renewal” shall not be deemed to include any renewal or replacement of a petty nature when the part or fitting used for replacement is not inferior in strength, efficiency or otherwise to the replaced part or fitting.
3. Limitation of Application
(1) Nothing in this Act shall apply in the case of any boiler or steam-pipe— (a) in any steam-ship as defined in section 3 of the Indian Steam-ships Act, 1884, or in any steam-vessel as defined in section 2 of the Inland Steam-vessels Act, 1917; or (b) belonging to, or under the control of, the Army, Navy or Air Force; or (c) appertaining to a sterlizer or disinfector of a type such as is commonly used in hospitals, if the boiler does not exceed 91 litres in capacity. (2) The Central Government may, by notification in the Official Gazette, declare that the provision of this Act shall not apply in the case of boilers of steam-pipes, or of any specified class of boilers or steam-pipes, belonging to or under the control of any railway administered by the Central Government or by any State Government or by any railway company as defined in clause (5) of section 3 of the Indian Railways Act, 1890.
4. Power to limit extent
The State Government may, by notification in the Official Gazette, exclude any specified area from the operation of all or any specified area from the operation of all or any specified provisions of this Act.
5. Chief Inspector, Deputy Inspectors and Inspectors
(1) The state Government may appoint such persons as it thinks fit to be Inspectors for the State for the purposes of this Act, and may define the local limits within which each Inspector shall exercise the powers and perform the duties conferred and imposed on Inspectors by or under this Act. (2) The State Government may appoint such persons as it thinks fit to be the Deputy Chief Inspectors for the State any may define the local limits within which each Deputy Chief Inspector shall exercise his powers and perform his duties under this Act. (3) Every Deputy Chief Inspector may exercise the powers and perform the duties conferred and imposed on inspectors by or under this act and, in addition thereto, may exercise such powers or perform such duties conferred or imposed on the Chief Inspector by or under this Act, as the State Government may assign to him. (4) The State Government shall appoint a person to be Chief Inspector for the State who may, in addition to the powers and duties conferred and imposed on the Chief Inspector by or under this Act, exercise any power or perform any duty so conferred or imposed on Deputy Chief Inspectors or Inspectors. (5) Subject to the provisions of this Act, the Deputy Chief Inspectors and Inspectors shall exercise the powers and perform the duties conferred and imposed on them by or under this Act under the general superintendence and control of the Chief Inspector. (6) The Chief Inspector, Deputy Chief Inspectors and Inspectors may offer such advice as they think fit to owners regarding the proper maintenance and safe working of boilers. (7) The Chief Inspector and all Deputy Chief Inspectors and Inspectors shall be deemed to be public servants within the meaning of section 21 of the Indian Penal Code.
6. Prohibition of use unregistered or uncertified boiler
Save as otherwise expressly provided in this Act, no owner of a boiler or permit it to be used --- (a) unless it has been registered in accordance with the provisions of this Act; (b) in the case of any boiler which has been transferred from one State to another, until the transfer has been reported in the prescribed manner; (c) unless a certificate or provisional order authorising the use of the boiler is for the time being in
7. Registration
(1) The owner of any boiler which is not registered under the provisions of this Act may apply to the Inspector to have the boiler registered. Every such application shall be accompanied by the prescribed fee. (2) On receipt of an application under sub-section (1), the Inspector shall fix a date, within thirty days or such shorter period as may be prescribed from the date of the receipt, for the examination of the boiler and shall give the owner thereof not less than ten day’s notice of the date so fixed. (3) On the said date the Inspector shall proceed to measure and examine the boiler and to determine in the prescribed manner the maximum pressure, if any, at which such boiler may be used, and shall report the result of the examination to the Chief Inspector in the prescribed form. (4) The Chief Inspector, on receipt of the report, may (a) register the boiler and assign a register number thereto either forthwith or after satisfying himself that any structural alteration, addition or renewal which he may deem necessary has been made in or to the boiler or any steam-pipe attached thereto, or (b) refuse to register the boiler: Provided that where the Chief Inspector refuses to register a boiler, he shall forthwith communicate his refusal to the owner of the boiler together with the reasons therefor. (5) The Chief Inspector shall, on registering the boiler, order the issue to the owner of a certificate in the prescribed form authorising the use of the boiler for a period not exceeding twelve months at a pressure not exceeding such maximum pressure as he thinks fit and as is in accordance with the regulations made under this Act: Provided that a certificate issued under this sub-section in respect of an economiser or of an unfired boiler which forms an integral part of a processing plant in which steam is generated solely by the use of oil, asphalt or bitumen as a heating medium may authorise its use for a period not exceeding twenty-four months. (6) The Inspector shall forthwith convey to the owner of the boiler the orders of the Chief Inspector and shall in accordance therewith issue to the owner any certificate of which the issue has been ordered, and, where the boiler has been registered, the owner shall within the prescribed period cause the register number to be permanently marked thereon in the prescribed manner.
8. Renewal of certificate
(1) A certificate authorising the use of a boiler shall cease to be in force (a) on the expiry of the period for which it was granted; or (b) when any accident occurs to the boiler; or (c) when the boiler is moved, the boiler not being a vertical boiler the heating surface of which is less than 18.58 square meters, or a portable or vehicular boiler; or (d) when any structural alteration, addition or renewal is made in or to any steam-pipe attached to the boiler; or (e) if the Chief Inspector in any particular case so directs, when any structural alteration, addition or renewal is made in or to any steam pipe made in or to any steam-pipe attached to the boiler; or (f) on the communication to the owner of the boiler of an order of the Chief Inspector or Inspector prohibiting its use on the ground that it or any steam-pipe attached therto is in a dangerous condition. (2) Where an order is made under clause (f) of sub-section (1), the grounds on which the order is made shall be communicated to the owner with the order. (3) When a certificate ceases to be in force, the owner of the boiler may apply to the Inspector for a renewal thereof for such period not exceeding twelve months as he may specify in the application: Provided that where the certificate relates to an economiser or an unfired boiler which forms an integral part of a processing plant in which steam is generated solely by the use of oil, asphalt or bitumen as a heating medium, the application for its renewal may be for a period not exceeding twenty-four months. (4) An application under sub-section (3) shall be accompanied by the prescribed fee and, on receipt thereof, the Inspector shall fix a date, within thirty days or such shorter period as may be prescribed from the date of the receipt, for the examination of the boiler and shall give the owner thereof not less than ten days’ notice of the date so fixed: Provided that, where the certificate has ceased to be in force owing to the making of any structural alteration, addition or renewal, the Chief Inspector may dispence with the payment of any fee: Provided further that in the case of an economiser or of an unfired boiler which forms an integral part of a processing plant in which steam is generated solely by the use of oil, asphalt or bitumen as a heating medium, the date fixed for its examination shall be within sixty days from the date of the receipt of the application and the owner shall be given not less than thirty days’ notice of the date so fixed. (5) On the said date the Inspector shall examine the boiler in the prescribed manner, and if he is satisfied that the boiler and the steam-pipe or steam-pipes attached thereto are in good condition shall issue a renewed certificate authorising the use of the boiler for such period not exceeding twelve months and at a pressure not exceeding such maximum pressure as he thinks fit and as it in accordance with the regulations made under this Act: Provided that a renewed certificate issued under this sub-section in respect of an economiser or of an unfired boiler which forms an integral part of a processing plant in which steam is generated solely by the use of oil, asphalt or bitumen as a heating medium may authorise its use for a period not exceeding twenty four months: Provided further that if the Inspector (a) proposes to issue any certificate (i) having validity for a less period than the period entered in the application, or (ii) Increasing or reducing the maximum pressure at which the boiler may be used, or (b) proposes to order any structural alteration, addition or renewal to be made in or to the boiler or any steam-pipe attached thereto, or (c) is of opinion that the boiler is not fit for use, the Inspector shall, within forty-eight hours of making the examination, inform the owner of the boiler in writing of his opinion and the reasons therefor, and shall forthwith report the case for orders to the Chief Inspector. (6) The Chief Inspector, on receipt of a report under sub-section (5) may, subject to the provisions of this Act and of the regulations made hereunder, order the renewal of the certificate in such terms and on such conditions, if any, as he thinks fit, or may refuse to renew it: Provided that where the Chief Inspector refuses to renew a certificate, he shall forthwith communicate his refusal to the owner of the boiler, together with the reasons therefor. (7) Nothing in this section shall be deemed to prevent an owner of a boiler for applying for are renewed certificate therefor at any time during the currency of a certificate.
9. Provisional orders
Where the Inspector reports the case of any boiler to the chief Inspector under sub-section (3) of section 7 or sub-section (5) of section 8, he may, if the boiler is not a boiler the use of which has been prohibited under clause (f) of sub-section (1) of section 8, grant to the owner thereof a provisional order in the prescribed form for the use of the boiler at a pressure not exceeding such maximum pressure as he thinks fit and as is in accordance with the regulations made under this Act pending the receipt of the orders of the Chief Inspector. Such provisional order shall cease to be in force (a) on the expiry of six months from the date on which it is granted, or (b) on receipt of the orders of the Chief Inspector, or (c) in any of the cases referred to in clauses (b), (c), (d), (e) and (f) of sub-section (1) of section 8, and on so ceasing to be in force shall be surrendered to the Inspector.
11. No structural alteration, addition or renewal shall be made in or to any boiler registered under this Act unless such alteration, addition or renewal has been sanctioned in writing by the Chief Inspector.
No structural alteration, addition or renewal shall be made in or to any boiler registered under this Act unless such alteration, addition or renewal has been sanctioned in writing by the Chief Inspector.
12. Alterations and renewals to steam-pipes
Before the owner of any boiler registered under this Act makes any structural alteration, addition or renewal in or to any steam-pipe attached to the boiler, he shall transmit to the Chief Inspector a report in writing of his intention, and shall send therewith such particulars of the proposed alteration, addition or renewal as may be prescribed.
13. Duty of owner at examination
(1) On any date fixed under this Act for the examination of a boiler, the owner thereof shall be bound -- (a) to afford to the Inspector all reasonable facilities for the examination and all such information as may reasonably be required of him: (a) to have the boiler properly prepared and ready for examination in the prescribed manner; and (b) in the case of an application for the registration of a boiler, to provide such drawings, specifications, certificates and other particulars as may be prescribed. (2) If the owner fails, without reasonable cause, to comply with the provisions of sub-section (1), the Inspector shall refuse to make the examination and shall report the case to the Chief Inspector who shall, unless sufficient cause to the contrary is shown, require the owner to file a fresh application under section 7 or section 8, as the case may be, and may forbid him to use the boiler notwithstanding anything contained in section 10.
14. Production of certificates, etc
The owner of any boiler who holds a certificate or provisional order relating thereto shall, at all reasonable times during the period for which the certificate or order is in force, be bound to produce the same when called upon to do so by a District Magistrate, Commissioner of Police or Magistrate of the first class having jurisdiction in the area in which the boiler is for the time being, or by the Chief Inspector or by an Inspector or by Inspector appointed under the Indian Factories Act, 1911, or by any person specially authorised in writing by a District Magistrate or Commissioner of Police.
15. Transfer of certificates, etc.
If any person becomes the owner of a boiler during the period for which a certificate or provisional order relating thereto is in force, the preceding owner shall be bound to make over to him the certificate or provisional order.
16. Power of entry
An Inspector may, for the purpose of inspecting or examining a boiler or any steam-pipe attached thereto or of seeing that any provision of this Act or of any regulation or rule made thereunder has been or is being observed, at all reasonable times enter any place or building within the limits of the area for which he has been appointed in which he has reason to believe that a boiler is in use.
18. Appeals to Chief Inspector
Any person considering himself aggrieved by -- (a) an order made or purporting to be made by an Inspector in the exercise of any power conferred by or under this Act, or (b) a refusal of an Inspector to make any order or to issue any certificate which he is required or enabled by or under this act to make or issue. May, within thirty days from the date on which such order or refusal is communicated to him, appeal against the order or refusal to the Chief Inspector.
19. Appeals to appellate authority
Any person considering himself aggrieved by an original or appellate order of the Chief Inspector -- (a) refusing to register a boiler or to grant or renew a certificate in respect of a boiler; or (b) refusing to grant a certificate having validity for the full period applied for; or (c) refusing to grant a certificate authorising the use of a boiler at the maximum pressure desired; or (d) withdrawing or revoking a certificate or provisional order; or (e) reducing the amount of pressure specified in any certificate or the period for which such certificate has been granted; or (f) ordering any structural alteration, addition or renewal to be made in or to a boiler or steam-pipe, or refusing sanction to the making of any structural alteration, additional or renewal in or to a boiler, may, within thirty days of the communication to him of such order, lodge with the Chief Inspector an appeal to an appellate authority to be constituted by the State Government under this Act.
22. Minor penalties
Any owner of a boiler who refuses or without reasonable excuse neglects-- (i) to surrender a provisional order as required by section 9, or (ii) to produce a certificate or provisional order when duly called upon to do so under section 15, or (iii) to make over to the new owner of a boiler a certificate or provisional order as required by section 16, Shall be punishable with fine which may extend to five thousand rupees.
23. Penalties for illegal use of boiler
Any owner of a boiler who, in any case in which a certificate or provisional order is required for the use of the boiler under this Act, uses the boiler either without any such certificate or order being in force or at a higher pressure than that allowed thereby, shall be punishable with fine which may extend to twenty thousand rupees and, in the case of continuing offence, with an additional fine which may extend to five thousand rupees for each day after the first day in regard to which he is convicted of having persisted in the offence.
24. Other penalties; Penalties for tempering with register mark.
Any person who -- (a) uses or permits to be used a boiler of which he is the owner and which has been transferred from one State to another without such transfer having been reported as required by section 6, or (b) being the owner of a boiler fails to cause the register number allotted to the boiler under this Act to be marked on the boiler as required by sub-section (6) of section 7, or (c) makes any structural alteration, addition or renewal in or to a boiler without first obtaining the sanction of the Chief Inspector when so required by section 12, or to a steam-pipe without first informing the Chief Inspector, when so required by section 13, or (d) fails to report an accident to a boiler or steam-pipe when so required by section 18, or (e) tampers with a safety valve of a boiler so as to render it inoperative at the maximum pressure at which the use of the boiler is authorised under this Act, or (f) allows another person to go inside a boiler without effectively disconnecting the same in the prescribed manner from any steam or hot water connection with any other boiler or from fuel mains, shall be punishable with fine which may extend to five hundred rupees.
25. Penalties for tempering with register mark.
(1) Whoever removes, alters, defaces, renders invisible or otherwise tampers with the register number marked on a boiler in accordance with provisions of this Act or any Act repealed hereby, shall be punishable with fine which may extend to five hundred rupees.
26. Limitation and previous sanction for prosecutions
No prosecution for an offence made punishable by or under this Act shall be instituted except within twenty-four months from the date of the commission of the offence, and no such prosecution shall be instituted without the previous sanction of the chief Inspector.
28. Power of Central Government to make regulations
The Board may, by notification in the Gazette of India, make regulations consistent with this Act for all or any of the following purposes, namely:-- (a) for laying down the standard conditions in respect of material, design and construction which shall be required for the purpose of enabling the registration and certification of a boiler under this Act; (aa) for prescribing the circumstances in which, the extent to which, and the conditions subject to which variation from the standard conditions laid down under clause (a) may be permitted: (b) for prescribing the method of determining the maximum pressure at which a boiler may be used; (c) for regulating the registration of boilers, prescribing the fees payable therefor and for the inspection and examination of boilers or parts thereof, the drawings, specification, certificates and particulars to be produced by the owner, the method of preparing a boiler for examination, the form of the Inspector’s report thereon, the method of marking the register number, and the period within which such number is to be marked on the boiler; (d) for regulating the inspection and examination for boilers and steam-pipes, and prescribing forms of certificates therefor; (e) for ensuring the safety of persons working inside a boiler; and (f) for providing for any other matter which is not, in the opinion of the Board, a mater of merely local or State importance.
29. Power to make rules
The State Government may, by notification in the Official Gazette, make rules consistent with this Act and the regulations made there under for all or any of the following purposes, namely:-- (a) for prescribing the qualifications and duties of the Chief Inspector of Deputy Chief Inspector and of Inspectors, for prescribing or constituting authorities to which they shall respectively be subordinate and the limits of the administrative control to be exercised by such authorities; (b) for regulating the transfer of boilers; (c) for providing for the registration and certification of boilers in accordance with the regulations made under this Act; (d) for requiring boilers to be in charge of persons holding certificates of proficiency or competency, and for prescribing the conditions on which such certificates may be granted; (e) for prescribing the times within which Inspectors shall be required to examine boilers under section 7 or section 8; (f) for prescribing the fees payable for the issues of renewed certificates, for the inspection and examination of boilers or parts thereof or drawings for steam-pipes, for the testing of welders or for any other matter which, in the opinion of the State Government, would involve time and labour, and for prescribing the method of determining the amount of such fees in each case; (g) for regulating inquires into accidents, (h) for constituting the appellate authority referred to in session 20, and for determining its powers and procedures; (i) for determining the mode of disposal of fees, costs and penalties levied under this Act; and (j) generally to provide for any matter which is, in the opinion of the State Government, a matter of merely local importance in the State.
30. Penalty of breach of rule
Any regulation of rule made under section 28 or section 29 may direct that a person contravening such regulation or rule shall be punishable, in the case of a first offence, with fine which may extend to one hundred rupees and in the case of any sub-sequent offence, with fine which may extend to one thousand rupees.
31. Publication of regulations and rules
(1) The power to make regulations and rules conferred by sections 28 and 29 shall be subject to the condition of the regulations and rules being made after previous publication (2) Regulations and rules so made shall be published in the Gazette of India and the local official Gazette, respectively, and, on such publication, shall have effect as if enacted in this Act.
31A. Power of Central Government to give directions
The Central Government may give such directions as it may deem necessary to a State Government regarding the carrying into execution of the provisions of this Act, and the State Government shall comply with such directions.
32. Recovery of fees, etc
All fees, costs and penalities levied under this Act shall be recoverable as arrears of land-revenue.
33. Application of Act to Government boilers
Save as otherwise expressly provided, this Act shall apply to boilers and steam-pipes belonging to the Government.
34. Power to exempt
(1) The State Government may, by notification in the Official Gazette, exempt from the operation of this Act, subject to such conditions and restrictions as it thinks fit, any boilers of classes or types of boilers used exclusively for the heating of buildings or the supply of hot water. (2) In case of any emergency the State Government may, by general or special order in writing, exempt any boilers or steam-pipes or any class of boilers or steam-pipes or any boiler or steam-pipe from the operation of all or any of the provisions of this Act. (3) If the State Government is satisfied that, having regard to the material, design or construction of boilers and to the need for the rapid industrialisation of the country, it is necessary to do so, it may, by notification in the Official Gazette and subject to such conditions and restrictions as may be specified class of boilers of steam-pipes in the whole or any part of the State, from the operation of all or any of the provisions of this Act.