Chapter VI EMBANKMENT WORKS
Chapter VI EMBANKMENT WORKS
18. Execution of Embankment Work
- (1) Whenever it appears to the concerned Divisional Officer (E.E) of the department that any of the following acts, should be done, or works executed, that is to say;
- (a) that any embankment which connects public embankments or forms by function with the part of a line of embankments, or that any embankment or water channel which is necessary for the protection or drainage of the neighbouring country, should be taken charge of and maintained by the officers of Government;
- (b) that any embankment, or any obstruction of any kind, which endangers the stability of a public embankment or the safety of any town or village, or which is likely to cause loss of property by interfering with the general drainage or flood drainage of any tract of lands, should be removed or altered;
- (c) that the line of any public embankment should be changed or lengthened or that a new public embankment should be constructed instead of any public embankment, or that any embankment should be constructed for the protection of any land or for the improvement of any water- channel, or that a sluice in any public embankment should be made;
- (d) that any sluice or water channel should be made, or that any public water channel should be altered for the improvement of the public health or for the protection of any village or cultivable land.
- (e) That any road which interferes with the drainage of any tract of land should be altered, or that any water- channel under or through such road should be constructed.
- (2) The concerned Divisional Officer (EE) shall cause to be prepared estimates of the cost of such works together with plans and specifications of the same
as may be required, he shall also cause to be prepared from the survey map
of the district, a map showing the boundaries of the lands likely to be affected by the said acts and work, and he shall cause a general notice to be given on his intention to cause such works to be executed; Provided that whenever it shall appear to the concerned Divisional officer (EE) that delay in execution of any works occasioned by proceeding commenced by a general notice under the Act would be attended with grave and imminent danger of life or property, he may forthwith cause the execution of such works to be began in anticipation of the completion of such proceeding provided further that without delay the estimates, specifications and plans of the proposed works together with a copy of the
ဆင map as provided shall be prepared and general notice shall be given that the work mentioned therein has already been commenced.
Chapter VI EMBANKMENT WORKS
19. Form of notice
Such general notice as may be prescribed shall be given alongwith a list of all villages, as far as is known, which are likely to be affected by the proposed work.
Chapter VI EMBANKMENT WORKS
20. Application for new sluices, embankments or drainage
If any person desires that-
- (a) a sluice be made in any public embankment for the purpose of drainage or irrigation; or
- (b) any new embankment be erected, or any existing embankment be lengthened, enlarged, repaired or removed, or that the line of any embankment be altered or that any new water channel be made, or that any water -channel be obstructed or diverted; he may make an application in writing to the concerned Executive Engineer.
Chapter VI EMBANKMENT WORKS
21. Operation of sluices
Sluices constructed in any public embankment shall be opened or should only by or with the general or special permission of the Executive Engineer or of the officer in the immediate charge of the embankment, under such order, either general or special, as he may receive from the Executive Engineer.